Warranty: | 2 Years |
---|---|
Installation: | Direct Connected |
Usage: | Multi-Functional Energy Meter |
Electric Equipment: | Three-phase Four-wire |
Theory: | Electronic Meter |
Power Meter Connection: | Terminal |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Acrel-2000ES, the energy storage management system of Acrel, is an energy storage EMS developed specifically for industrial and commercial energy storage cabinets and energy storage containers produced by equipment suppliers, energy storage integrators, and battery manufacturers. It has complete energy storage monitoring and management functions, covering detailed information of energy storage system equipment (PCS, BMS, electric meters, fire protection, air conditioning, etc.), and realizes functions such as data collection, data processing, data storage, data query and analysis, visual monitoring, alarm management, and statistical reports. It supports energy scheduling in advanced applications, and has control functions such as planning curves, peak shaving and valley filling, demand control, and backflow prevention.
Acrel-2000ES Energy storage management system
|
||
NO
|
Parameter
|
Description
|
1
|
System access
|
PCS, BMS, electric meter, temperature control, fire protection, flooding, smoke detection, video, access control, etc.
|
2
|
Hardware configuration
|
CPU: Intel Celeron 5205U; Memory: 8G; Hard disk: 512G; Operating system: Windows
|
3
|
Communication interface
|
4×RS485,4×USB3.0,2×LAN,1×HDMI,8×DI (optional),8×DO (optional)
|
4
|
Dommunication mode
|
Support RS485, TCP/IP and 4G (optional), etc.
|
5
|
Display screen
|
Capacitive screen, 13.3 inches (optional 15.6, 17.3 inches); resolution: 1920×1080
|
6
|
Main function
|
Equipment control, status monitoring, charge and discharge optimization scheduling, abnormal alarm, data forwarding, parameter
setting, communication management, graphics drawing, video monitoring, historical curves, event query, report statistics,
authority management
|
7
|
Support protocol
|
Supports communication protocols such as IEC101, IEC103, IEC104, MODBUSRTU/TCP and private protocols
|
No
|
Strategy category
|
Remark
|
1
|
Manual strategy
|
Supports manual switching between on-grid and off-grid, which requires PCS protocol support for control.
|
2
|
Planning curve (peak shaving and valley filling)
|
Users can configure the electricity price template according to the local time-of-use electricity price, set the charging and
discharging power of PCS in different time periods, and form a peak-shaving and valley-filling strategy template; provide the
function of configuring strategy templates by day and week, and adapt to the strategy operation mode in multiple regions and
multiple electricity price environments.
|
3
|
Demand control
|
The demand value is collected in real time by connecting the main meter to the low-voltage side of the transformer of the main
incoming line. When the demand value reaches the limit value (settable), the demand control is triggered. The system reduces the
charging and discharging of the energy storage according to the configured parameters.
|
4
|
Dynamic expansion
|
The transformer load rate is collected in real time by connecting a main meter to the low-voltage side of the transformer of the
main incoming line. When the transformer load rate reaches the limit value (settable), the protection is triggered. The system
reduces charging and discharging of the energy storage according to the configured parameters.
|
5
|
Anti-reverse flow control
|
By connecting the main meter on the low-voltage side of the transformer of the main incoming line to collect reverse power data in
real time, when reverse power occurs and reaches the limit value (settable), the system will perform actions such as static,
reduced discharge, and charging of energy storage according to the configured parameters. The system's anti-reverse flow strategy
is implemented as software protection. If a faster response and more reliable protection is required, a corresponding reverse
power protection device needs to be added, and the circuit breaker will trip immediately when reverse flow is detected.
|
6
|
Anti-reverse flow control
|
When the power grid is abnormal or fails, it supports off-grid operation, which requires PCS to support this function.
|
7
|
Dynamic ring protection strategy
|
Read equipment operation data in real time, and perform abnormal alarm protection and linkage control based on limit parameters
|
Q:Where is your company located?
A:Our headquarter is in Shanghai, our factory locates in Jiangyin,Jiangsu Province,China.
It takes about 1 hour by car from Shanghai Hongqiao International Airport to our factory
Q:What's your lead time?
A:Sample time 1-3days,mass production 10~20days for order more than 500pcs
Q:Payment terms?
A:Usually,TT,credit card,western union,in cash and so on.You can also choose to pay 30% as deposit and the balance before shipment.
Q:What certifications do you have ?
A:We have ISO9001,IEC,CE and so on.
Q:Can other logo be put on your products(OEM)?
A:Yes,but MOQ for OEM will be at least 100pcs.We also need you provide logo Ai Format or EPS.
Suppliers with verified business licenses